INTRODUCTION
⌅Within the technological process of rice production, the use of harvesting machines is a matter of undoubted interest. The deterioration and the years of exploitation of the means used during the technical assistance of these machines, has caused a decrease in their technical availability, which affects productivity during the harvest (Rodríguez-López et al., 2022RODRÍGUEZ-LÓPEZ, Y.; AMBROSIO, Y.; JIMÉNEZ-ÁLVAREZ, Y.: “La Estabilidad en la composición racional del sistema cosecha-transporte-recepción de la caña de azúcar”, Revista Ciencias Técnicas Agropecuarias, 31(2), 2022, ISSN: 2071-0054.). Hence the importance of the correct execution of technical maintenance and repair operations; to guarantee the functioning of the machinery in operation, until they can be completely renewed, according to the economic possibilities of the country (Paneque et al., 2018PANEQUE, R.P.; LÓPEZ, C.G.; MAYANS, C.P.; MUÑOZ, G.F.; GAYTÁN, R.J.G.; ROMANTCHIK, K.E.: Fundamentos Teóricos y Análisis de Máquinas Agrícolas, Ed. Universidad Autónoma Chapingo, primera ed., vol. 1, Chapingo, Texcoco, México, 456 p., 2018, ISBN: 978-607-12-0532-2.).
In the EAIG "Los Palacios", as in the whole country, the deterioration of the machines requires greater demand for technical assistance. In addition, it implies the need of organizing the maintenance and repairing processes, drawing up strategies that ensure an optimal decision at all times, based on maintainability criteria (CAI Los Palacios- Cuba, 2011CAI LOS PALACIOS- CUBA: Informe al Consejo ampliado de Mecanización, Inst. Complejo Agroindustrial Los Palacios, Pinar del Río, Informe Institucional, CAI Los Palacios. Pinar del Río. Cuba, 2011.; Azoy, 2014AZOY, C.A.: “Método para el cálculo de indicadores de mantenimiento”, Ingeniería agrícola, 4(4): 45-49, 2014, ISSN: 2306-1545.; Herrera-González et al., 2017HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.; Mamani-Cabellos, 2019MAMANI-CABELLOS, L.M.: Mejora y Actualización del Plan de Mantenimiento Preventivo de Los Equipos Biomédicos del Área Central de Esterilización del Complejo Hospitalario Guillermo Kaelin de la Fuente, Inst. Universidad Nacional Tecnológica de Lima Sur, Lima, Perú, publisher: Universidad Nacional Tecnológica de Lima Sur, 2019.).
Grajales et al. (2006)GRAJALES, D.H.; PINZÓN, M.C.; ORTIZ, S.Y.: “La confiabilidad, la disponibilidad y la mantenibilidad, disciplinas modernas aplicadas al mantenimiento.”, Scientia et technica, 1(30): 155-160, 2006, ISSN: 0122-1701. point out that reliability, availability and maintainability are powerful tools that help maintenance personnel to make decisions. These tools provide the criteria for developing strategic maintenance management and in order to increase availability, priority must be given to maintainability (Shkiliova, 2004SHKILIOVA, L.: “Fiabilidad y mantenimiento. Apuntes de las conferencias para el postgrado”, En: Conferencias de Posgrado Facultad de Mecanización Agropecuaria. Universidad Agraria de la Habana “Fructuoso Rodríguez Pérez” La Habana. Cuba, Ed. UNAH, La Habana, Cuba, San José de las Lajas, La Habana, Cuba, 2004.; Shkiliova et al., 2011SHKILIOVA, L.; RIBERT-MOLLEDA, Y.; GONZÁLEZ-LÓPEZ, C.: “Disponibilidad de las cosechadoras de arroz New Holland TC-57 durante el período de garantía en las condiciones del Complejo Agroindustrial Arrocero Los Palacios”, Revista Ciencias Técnicas Agropecuarias, 20(4): 63-68, 2011, ISSN: 2071-0054.; Shkiliova y Fernández-Sanchez, 2011SHKILIOVA, L.; FERNÁNDEZ-SANCHEZ, M.: “Sistemas de Mantenimiento Técnico y Reparaciones y su aplicación en la Agricultura”, Revista Ciencias Técnicas Agropecuarias, 20(1): 72-77, 2011, ISSN: 2071-0054.).
Miranda et al. (2008)MIRANDA, C.; IGLESIAS, C.; SHKILIOVA, L.: Investigación del proceso de cosecha mecanizada del arroz, Centro de Mecanización Agropecuaria. Estación Experimental de arroz “Los Palacios”, Monografía, San José de las Lajas, La Habana, Cuba, 2008. state that the increase in combine harvester breakages is influenced by little attention to planned technical maintenance which should control and prevent failures and take measures to help increasing the productivity of the combines, once the parts that fail and the effect they cause are known. Another of the negative incidents during the maintenance work of the machines, is not having the organization, resources and trained personnel that respond to the current demands of improving the operating conditions and the improvement of the reliability indices (Fernández-Abreu y Shkiliova, 2012FERNÁNDEZ-ABREU, O.; SHKILIOVA, L.: “Adaptabilidad de la cosechadora de arroz Laverda 225 REV para las operaciones de Mantenimientos Técnicos”, Revista Ciencias Técnicas Agropecuarias, 21(2): 76-80, 2012, ISSN: 2071-0054.; Figueredo-Álvarez, 2018FIGUEREDO-ÁLVAREZ, S.: Vías para la introducción de mejoras al Sistema de Mantenimiento de la Cosechadora de Caña cca-5000., Inst. Universidad de Holguín, Facultad de Ingeniería, Departamento de Ingeniería, Holguín, Cuba, publisher: Universidad de Holguín, Facultad de Ingeniería, Departamento de Ingeniería …, 2018.; Diaz-Restrepo, 2020DIAZ-RESTREPO, H.D.: Diseño de un programa de mantenimiento preventivo de la sección de empaquetado de la planta molino oro de la cooperativa agropecuaria de Norte de Santander-Coagronorte. ltda, Inst. Universidad Francisco de Paula Santander, Informe Técnico, publisher: Universidad Francisco de Paula Santander, 2020.).
The investigations carried out previously reflect the need to comply with quality maintenance to increase the reliability of exploitation and, although it is characterized by the expenses of time and resources for the maintenance of its working capacity, they are limited to consider the expenses of time, living labor of people, spare parts and other materials for repairing. (de la Cruz-Pérez et al., 2013DE LA CRUZ-PÉREZ, A.A.M.; MIRANDA-CABALLERO, A.; SHKILIOVA, L.; RIBET-MOLLEDA, Y.; FERNÁNDEZ-ABREU, O.: “Análisis de la disponibilidad técnica de la cosechadora de arroz CLAAS DOMINATOR 130”, Centro de Información y Gestión Tecnológica. CIGET Pinar del Río, 15(4), 2013.; Rivero & Suárez, 2015RIVERO, L.; SUÁREZ, C.: Instructivo Técnico Cultivo de Arroz, Ed. Asociación Cubana de Técnicos Agrícolas y Forestales, La Habana, Cuba:, 2015.; Figueredo-Álvarez, 2018FIGUEREDO-ÁLVAREZ, S.: Vías para la introducción de mejoras al Sistema de Mantenimiento de la Cosechadora de Caña cca-5000., Inst. Universidad de Holguín, Facultad de Ingeniería, Departamento de Ingeniería, Holguín, Cuba, publisher: Universidad de Holguín, Facultad de Ingeniería, Departamento de Ingeniería …, 2018.; Pérez-Olmo et al., 2018PÉREZ-OLMO, C.B.; TRUJILLO-RODRÍGUEZ, Y.; DAQUINTA-GRADAILLE, A.; GUTIÉRREZ-TORRES, R.; PLÁ-RODRÍGUEZ, E.: “Behavior of Operating Indicators of Massey Fergunson 5650 Grain Harvester”, Revista Ciencias Técnicas Agropecuarias, 27(4), 2018, ISSN: 2071-0054.). Expenses in maintenance are even minor if all the characteristics and previous events that occur before reaching the normal state are taken into account when evaluating the management and maintenance operation (Herrera-González et al., 2017HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.). They are design, assembly, operations, operator skills, modifications made, previous repairing, operating capacity, reliability, maintenance carried out throughout the useful life of the equipment, environment, legislation or indications, quality of spare parts, cleanliness and environmental impact it generates.
According to the existing problem, the objective of the research was to estimate and verify the maintainability of the rice harvesters during daily technical maintenance, every 30 hours and during the harvest period under the conditions of the Grain Agroindustrial Company (EAIG) "Los Palacios". That is, the ease and economy in the execution of maintenance of the rice harvesters, which in turn, allows having a methodological foundation for the solution to this scientific and practical problem in the organization and rationalization of maintenance and, consequently, in the work capacity of the harvesters (Herrera-González et al., 2017HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.).
MATERIALS AND METHODS
⌅The experimental research was carried out at the EAIG "Los Palacios", Pinar del Río Province. The fieldwork and the characterization of the experimental site, is carried out under the repairing and harvesting conditions of the UEBA "Sierra Maestra. The evaluation of the factors that influence maintainability was carried out in three models of New Holland L-521, L-624, L-626 combine harvesters, during daily technical maintenance (10 h) and periodic MT-1 (every 30 h), in June-July and September-November 2020 rice harvest periods.
Methodology for Collecting Information on Maintenance Times
⌅For collecting information on the cost of time to carry out maintenance, a series of measuring instruments was necessary (digital stopwatches with an accuracy of 1/10s (1%), work control models of the harvest brigade (area worked, amount of grain harvested, fuel consumed and duration of the day). In addition, documentation from the UEBA prepared by the plot manager (field, area, field yield, variety cultivated) and a set of tables prepared previously for primary data taking (Herrera-González et al., 2017HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.)
Table 1 reflects the types of technical maintenance carried out. Column 1 shows the model and chassis number of the machine; column 2 indicates the type of maintenance and column 3 the tools used. Average time spent on maintenance (main and auxiliary time) is entered in columns 4 and 5. Column 6 provides information on the number of people involved.
Machine | Type of Maintenance | Tools Used | Average Time Used | Personnel | |
---|---|---|---|---|---|
Principal | Auxiliary | ||||
1 | 2 | 3 | 4 | 5 | 6 |
Time Used /days, min | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Times | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
Maintenance Start | ||||||||||
Maintenance Operations Daily and/or Every 30 h | ||||||||||
Maintenance End |
Phototiming begins with the first task of the day, which is daily technical maintenance, which in some cases may coincide with the MT-1 periodic technical maintenance (every 30h). With the help of the clock, the start and end time is taken and with the stopwatch the duration of each maintenance operation is taken into account.
Before beginning the observation, it is necessary for each machine to collect the data related to its characteristics (name and brand, date of manufacture or repairing, name of the production or repair plant, place where the observation is made, start dates and termination of observation). Besides, working conditions and useful work of the machine, cases and causes of machine stoppages due to technical problems (carrying out technical maintenance, troubleshooting and repairs) are also referred.
Table 3 is the control model of daily work in exploitation, it is used to register the daily work of machines. The information about the field is obtained of the UEBA documents (technological chart of the area) and the amount of initial and end fuel is measured with the graduated rod that each machine has. The volume of work is taken from the report of the harvest issued by the leader of the brigade and then corroborated with the document issued by the reception center (receipt chart), the data of clean work time, shift hours and other harvesting materials are also referred.
Model No.______Date______ Name of the Operator______________ Crop___________ |
Company___________ Region or District_______ Field ______________ Labor _____________ |
Brand of the Machine__________________ Model____________ Serial No.____________ |
Fuel_________ Start____________ Final_________ Shift_______________ |
Volume of Work Performed t, ha_________ Fuel L___________ |
Time of Work (h/clean)_______Hours/shifts______Other Materials Used_______ |
Based on the Manual of Use and Care of Harvester (New Holland L series), data taken from the timing of daily maintenance operations, periodic every 30 hours settled in the Tables 1 and 2, are referred in Table 4, (columns 1 and 2). In column 3, the location of the point to be attended to is referred (At the side of the machine, P1; Top of the machine, P2; Under the machine, P3; Front of the machine, P4; Back part of the machine, P5). Column 4 provides information on the work positions of maintenance personnel, according to Kopchikov (1980) cited by Herrera-González et al. (2017)HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.. They are:
-
A: standing, working at shoulder height
-
B: standing leaning forward
-
C: standing working overhead
-
D: crouched
-
E: knee with straight spine
-
F: knee bent forward
-
G: lying on the back
-
H: seated leaning back
-
I: sitting leaning forward
-
J: lying face down
Columns 5...8 record the time spent at work, the item to be worked on, the tools used and the people involved in the operation. These data are taken from Tables 1 and 2.
Once these data are ordered, they are averaged by operation and machines, which will allow the analysis based on the theoretical basis (Minag-Cuba, 2002MINAG-CUBA: Instructivo Técnico del Arroz, Inst. Ministerio de la Agricultura (MINAG), Instituto de Investigaciones del Arroz (IIA), La Habana, Cuba, 2002.; 2008MINAG-CUBA: Instructivo Técnico del Arroz, Ed. Instituto de Investigaciones del Arroz, La Habana, Cuba, 2008.; Morejón-Rivera et al., 2012MOREJÓN-RIVERA, R.; DÍAZ-SOLÍS, S.H.; HERNÁNDEZ-MACÍAS, J.J.: “Comportamiento de tres variedades comerciales de arroz en áreas del complejo agroindustrial arrocero Los Palacios”, Cultivos Tropicales, 33(1): 46-49, 2012, ISSN: 0258-5936.; Herrera-González et al., 2017HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.).
Operation | Maintenance | Location of the Operation | Position of the Working Personnel | Time of Work in Minutes | Element or Set to Work | Tools Used | Amount of Persons |
---|---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Methodology for Processing Data that Influence Maintainability Levels
⌅To process the indicators that influence on maintainability, they are grouped into tables that allow calculating the data of technical maintenance by type (Table 2), which will allow the preparation of graphs necessary to show the results of the investigation.
Using the Mathcad 2000 professional calculation software, the average daily technical maintenance times, periodic every 30 h and the maintainability estimate are calculated. They are grouped in a Microsoft Excel database, which will allow the statistical processing of the arithmetic means, standard deviation, coefficients of variation, Kolmogorov's test for goodness of fit, and probability plots in the statistical program STATGRAPHICS PLUS, Version 5.1.
Determination and Evaluation of the Economic Effect
⌅The economic effect is based on the data obtained during the 2020 harvest period with the evaluation of the machines in operation there and the amount of grains left to harvest, it was determined by the equations:
where:
Adcpm- amount of grains left unharvested
TMdmd- Mean time of extra daily maintenance
TMdm30h- Mean time of maintenance every 30 extra hours
Wexp- Productivity
N- Number of maintenance
RESULTS AND DISCUSSION
⌅Estimation of the Maintainability of Technical Maintenance
⌅In the L-521 combine, there is a 97% probability that daily technical maintenance is carried out in 2 hours, 96% for the L-624 and 95.8% for the L-626. (Figure 1). It demonstrates that the two standard hours of daily maintenance is not enough time to carry out daily maintenance, which causes more time to be used (2.40 h), producing loss of harvester operating time (Herrera-González et al., 2017HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.).
For the periodic maintenance every 30 h, the L-521 combines have a 78% probability that the technical maintenance every 30 is carried out in 2 hours, 75% for the L-624 and 74% for the L-626. It shows that the two hours regulated to perform periodic technical maintenance every 30 hours is not enough.Therefore, it is necessary to increase the time up to 3 hours, which causes a loss of operating time of the combine. Hence, the probability of carrying out maintenance at zero time is zero. As the carrying out time is extended, the maintainability curve increases to become a maximum in a greater or infinite time. This reveals that as a larger and maximum time is assigned to carry out maintenance, the probability of doing so grows. Similar results were obtained by the same authors in 2017.
Evaluation and Determination of the Economic Effect
⌅As observed in Figure 2, the greatest loss occurs in the L-624 harvesters, which failed to harvest 112 7.86 t, which represents 225,571.08 Cuban pesos (CUP) and of these, 129,601.08 CUP belonging to the extra daily maintenance time. While the L-626 harvester stopped harvesting 779.46 t, which represents 155,892.8 CUP and of these, 90,518.40 CUP belonging to overtime for daily technical maintenance. The L-521 combine has more discrete values, the loss of rice left unharvested is 621.99 t, which represents 124,396.65 CUP, of which 33,533.01 CUP belonging to the extra daily maintenance time. Therefore, the situation could improve if overtime of daily technical maintenance caused by the deficiency of the logistical system (spare parts, tools and devices to carry out maintenance in the field) decreases. It is also necessary to train maintenance personnel, which would contribute to reduce the losses due to unproductive stops. These data coincide with the results obtained by the same authors in 2017 (Herrera-González et al., 2017HERRERA-GONZÁLEZ, E.; MIRANDA-CABALLERO, A.; MOREJÓN-MESA, Y.; PANEQUE-RONDÓN, P.: “Mantenibilidad de las cosechadoras de arroz New Holland en la empresa Los Palacios, Cuba”, Revista Ciencias Técnicas Agropecuarias, 26(4): 67-75, 2017, ISSN: 2071-0054.).
CONCLUSIONS
⌅-
From the results of estimation calculation, the probability that the daily technical maintenance is carried out in 2 hours is 97% for the L-521 combine, 96% for the L-624 combine and 95.8% for the L-626 combine.
-
The probability that the technical maintenance every 30 hours will be carried out in 2 hours for the L-521 combine is 78%, for the L-624 combine, 75% and for the L-626 combine,74%.
-
The probability of carrying out maintenance in a zero time is zero, as the carrying out time is extended, the maintainability curve increases to become a maximum in a greater or infinite time. This reveals that as a larger and maximum time is assigned to carry out maintenance, the probability of doing so grows.
-
The greatest loss occurs in the L-624 harvesters, which failed to harvest 112 7.86 t, that represents 225,571.08 Cuban pesos (CUP) and of these, 129,601.08 CUP belonging to overtime for daily maintenance. While the L-626 harvester stopped harvesting 779.46 t, which represents 155,892.8 CUP and of these, 90,518.40 CUP belonging to overtime for daily technical maintenance. The L-521 combine has more discrete values; the loss of rice left unharvested is 621.99 t, which represents 124,396.65 CUP, of which 33,533.01 CUP belonging to overtime for daily technical maintenance.